Know Studio
Photogrammetry · NeRF · Splat Plate Nº 03 · Line

3D Capture.

Photogrammetry, NeRF, Gaussian splat. Site, structure, terrain — modelled to your pipeline.

Use caseSite, structure, terrain
Lead time2–4 weeks
Turnaround7–14 days post-flight
DeliverableOBJ · USDZ · GLB · LAS · orbit MP4

Use cases · 04 rows

What gets shot.

Filed by downstream pipeline. Each row is one sentence; specifics are in the elaboration.

U.01 —

Architectural site capture for design and pre-viz.

Existing-conditions models for architects, landscape, urban design teams.

U.02 —

Construction progress documentation.

Monthly or quarterly captures of the same site, conformed and registered to a single coordinate frame.

U.03 —

Heritage and landmark capture.

Detailed preservation-grade scans of structures and grounds, with full point-cloud + textured mesh deliverables.

U.04 —

Film and game environment plates.

Captures intended for downstream relighting in Unreal, Unity, or Houdini — delivered with tiled textures and clean topology.

Process · 05 stages

Brief to handoff.

Brief → scout → fly → process → deliver. The deliverable shape determines the flight grid.

Stage 01 · Brief

Lead with the downstream pipeline.

Resolution, format, coordinate system, intended use. The deliverable shape determines the flight grid before the rig ever leaves the office.

Stage 02 · Scout

Grid + altitude + overlap planned in advance.

Flight density is pre-computed against ground sample distance — typically 2–4mm GSD for structures, 8–15mm for terrain.

Stage 03 · Fly

Programmed grid, manual cleanup passes.

Primary capture is automated grid; manual pilot adds verticals, undercuts, and detail passes that the grid misses.

Stage 04 · Process

RealityCapture or Metashape — your call on engine.

Processing goes to the engine your downstream pipeline prefers; default is RealityCapture for mesh + textures, NerfStudio or Postshot for splats.

Stage 05 · Deliver

OBJ · USDZ · GLB · LAS · orbit MP4.

Delivered as a pipeline-ready bundle. Re-meshing, retopology, and game-engine optimisation are quoted separately.

Rigs · 03 platforms

Rigs in rotation

Mavic 3 Pro for the workhorse grid; sub-250 for tight sites and interiors; Sicario when the brief calls for a cinema-grade sensor on the payload.

R1 · DJI Mavic 3 Pro

DJI Mavic 3 Pro

4/3″ Hasselblad · programmed grid · ~43 min flight

The workhorse for photogrammetry grids — smooth, programmed flight paths, high-overlap captures. Default rig for architectural and construction work. RTK precision available via rented base station on briefs that require it [confirm].

R2 · Sub-250 (3″)

Sub-250 (3″)

Mini-class · tight access · high overlap

Cool, got it — I can fly into this, I can fly out of that. Useful for interiors, doorways, and small-site captures where a larger rig won’t fit.

R3 · Sicario (7″ 8x cinelifter)

Sicario (7″ 8x cinelifter)

Cinema lift · Z Cam · RED Komodo · FX3

Heavy-lift capture when a brief calls for a cinema-grade sensor on the payload — film and game plate work, or texture pulls where the body matters as much as the geometry.

FAQ · 04 rows

Filed questions.

Accuracy, format, GIS, re-flight cadence. The four that come up most.

What accuracy do you deliver?

Accuracy depends on the flight plan, your GCPs, and the engine you choose. For survey-grade outputs ground control gets coordinated with your team — typical spec is `[confirm]`. Survey-grade isn’t promised without a contracted surveyor on site.

Splat or mesh — which should I ask for?

Mesh if it’s going into CAD, BIM, or simulation. Splat if it’s going into a viewer, a film comp, or anything that needs photorealism without geometry. Some sites get both.

Do you handle the GIS coordinate stuff?

Yes — delivery comes in UTM, State Plane, or your local grid. With ground control or a rented RTK base, captures arrive geolocated and ready to drop into your existing site model.

Can you re-fly the same site quarterly?

Yes. Subsequent captures register to the first using shared GCPs, so your monthly/quarterly captures land in the same coordinate frame for diffing.

§ 06 — Brief · Intake

Working on something atmospheric?

Send the shape of the project. Two business days back with a rig list, a crew, and a number.

Send a brief Avg. response < 48h